RNP 10 to Be Implemented in WATRS Plus Airspace June 2008
Jul 16, 2007 :: RNP 10 to Be Implemented in WATRS Plus Airspace June 2008On June 5, 2008, a redesigned route structure and 50 nm lateral separation between aircraft authorized RNP 10 or RNP 4 will be implemented in the WATRS Plus control areas. The FAA will accommodate a small percentage of flights by aircraft that are not RNP 10 endorsed, but eligible operators are urged to obtain operational approval for RNP 10 or RNP 4 by May 5, 2008. U.S. operators will continue to obtain operational approval using the guidance in FAA Order 8400.12A (RNP 10 Operational Approval). FAA Order 8400.12A and an 8400.12A-based job aid for U.S. operators and FAA inspectors are posted on the WATRS Plus web site at:
http://www.faa.gov/ats/ato/130.htm
